Civic Center Pedestrian Pathway Improvements
BID DATE
04/21/15 - 3:00
AGENCY
Campbell
ESTIMATE
$36,000
SCOPE
The work to be done, in general, under this contract consists of: asphalt concrete sawcutting; Portland Cement Concrete (PCC) saw-cutting; demolition, removal and disposal of existing concrete sidewalk, curbs, gutters, existing base material, and asphalt concrete pavement; root pruning; preparation of sub-base and base; installation of PCC accessibility ramp, driveways, sidewalk and curb and gutter; installation of asphalt concrete pavement; retrofit existing accessibility ramps; signing; striping; flow testing; providing and maintaining pedestrian access; traffic control; and all incidentals to complete said work in accordance with the contract documents.