Access the Full Project by Clicking here!
Bidjugde
JOB
East Sacramento Water Main Replacement Phase 2
BID DATE
04/22/15 - 2:00
AGENCY
Sacramento
ESTIMATE
$13,786,000
SCOPE
The work to be performed under these Special Provisions generally consists of furnishing and placing 6-inch, 8-inch, 12-inch and 30-inch diameter water mains. Also included is furnishing and installing all required fittings, valves, blow offs, air vacuum and release valves, system ties, fire hydrants and other appurtenances, water services, meter setters, meter boxes, lids, meter valves and water meters at various commercial and residential properties within designated areas of the City of Sacramento as indicated on the plans, and connecting to the existing distribution and transmission systems as indicated on the Plans. This contract also covers connecting city water services to existing residential water services, removing existing fire hydrants and abandoning existing mains and water services as shown on the Plans and in these Special Provisions. Rosa Millino - 916-808-1451 RMillino@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT