JOB
C900 Water Main Replacement
BID DATE
09/17/24 - 11:00
AGENCY
Black Canyon City WD
ESTIMATE
n/a
SCOPE
Meter sets 740m2 mm 33 5/8x3/4 Union C-Style Vertical Contractor to provide all labor and equipment for the installation of: Abbott St/Abbott Alley: 1,480-ft. of new 4" C-900 water main; and replace Twenty-nine (29) meters and existing service lines with 3/4" Schedule 80 PVC Buckskin Ct: 180-ft. of new 6" C-900 water main; and replace Four (4) meters and existing service lines with " Schedule 80 PVC Contractor to supply all shading, AB-material, concrete slurry and blacktop as Needed office@bccwid.org
PREBID
9/9/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT