Access the Full Project by Clicking here!
Bidjugde
JOB
Canyonland Tomboy Street Utility Paving Improvements.
BID DATE
09/10/24 - 5:00
AGENCY
Telluride
ESTIMATE
n/a
SCOPE
Installation of 770 LF of 10-inch sanitary sewer, four (4) 4-foot diameter manholes, and associated connections to existing sanitary sewer laterals and mains. Project involves construction dewatering with heavy metal removal, and all other associated work items for a complete sanitary sewer re-alignment project. Paving portions of the project involve removal and replacement of approximately 530 tons of 5-inch-thick hot mix asphalt, aggregate base course, subgrade preparation, and associated density and moisture testing. Project connects to existing manhole in Pacific Ave.,then involves upsizing existing 8-inch sewer along the east side of Tomboy St., then involves new sewer installation through the Canyonlands Lot, and then finishes with a connection to the existing manhole in W. Colorado Ave. Note that Bid Alternate A and Bid Alternate B have the exact same scope of work; however, different completion dates. Contractor may bid on one or both; however, one project (A or B) will be awarded based on price and schedule. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Canyonland-and-Tomboy-Street-Utility-and-Paving-Improvements/0000359488?purchasingGroupId=8409951&origin=2 togren@telluride-co.gov
PREBID
8/21/2024 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT