Access the Full Project by Clicking here!
Bidjugde
JOB
Madison Avenue Improvements from 2nd Avenue to 3rd Avenue
BID DATE
04/14/15 - 2:00
AGENCY
Yuma
ESTIMATE
n/a
SCOPE
Remove existing pavement and replace with Asphalt Concrete Paving; Remove and replace sidewalk, catch basins and curb and gutter at various locations; Reconstruct driveways and sidewalk ramps; Place interim and final pavement markings; Cutting, plugging and abandoning existing VCP sewer lines and manholes; Install PVC sanitary sewer pipe and sanitary sewer connections; Install sanitary sewer manholes; Install PVC sanitary sewer pipe; Cutting, plugging and abandoning existing water line; Install PVC water main and water service connections including all appurtenances; Project Traffic Control, SWPP measures and misc. construction.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT