Access the Full Project by Clicking here!
Bidjugde
JOB
Utility Improvements Sanitary Detention Storm Sewer Water Distribution System Serving French Quarte
BID DATE
08/21/24 - 10:00
AGENCY
Harris-Brazoria Counties MUD
ESTIMATE
n/a
SCOPE
French Quarter Subdivision Section 1 will need a water, sanitary, and drainage to serve the single-family homes. The sanitary will lead to a proposed Lift Station that will connect with a Force Main to an existing sanitary manhole maintained by the City of Pearland. Water will tie in to an existing line maintained by the City of Pearland. This will include all bends, pipes, manholes, cases, and other appurtenances related to the installation of the sanitary and water lines. The drainage includes these improvements to the existing Shadycrest Ditch along Pearland Parkway: 1. Widening the ditch. 2. Concrete lining the ditch 3. Adding RCB culverts 4. Relocating existing drainage in the ROW The drainage includes these improvements to the existing Industrial Drive Ditch along Industrial Drive: 1. Adding a concrete drop to reduce velocity 2. Adding RCB culverts 3. Cutting and filling to include a detention pond, widen the ditch, and include storm sewer outfalls. The subdivision will be serviced with storm sewer pipes, outfalls, manholes, inlets, and grading. https://www.civcastusa.com/project/66a506ccaa54d3e7bf4b58ff/summary mperales@huitt-zollars.com
UPDATES