JOB
Brine Disposal Pipeline Improvements
BID DATE
08/29/24 - 3:00 LIVE!
AGENCY
Goodyear
ESTIMATE
$12,998,830
SCOPE
s. One pipeline is a 17,700 linear foot, 12-inch HDPE gravity flow pipeline that would intercept discharge flows from the BWC, convey them along Bullard Avenue, Bullard Wash, Broadway Road, and S 159th Avenue and connect to an existing WRSS pipeline tapping sleeve immediately north of the Buckeye Canal. The second pipeline is a 6,960 linear foot, 12-inch HDPE gravity flow pipeline that would intercept discharge flows from Site 12, convey them along Cotton Lane and connect to an existing WRSS pipeline air release valve (ARV) vault immediately north of the Buckeye Canal. The existing WRSS ARV vault would be retrofitted for the connection. https://goodyearaz.bonfirehub.com/opportunities/147151 victoria.jackson@goodyearaz.gov LIVE: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NWQ2ODEwYmUtMjU5NS00ZjNmLWIwOGMtMGM0NTA4YWQ5MzUw%40thread.v2/0?context=%7b%22Tid%22%3a%22d3c15ad3-14d0-4259-b2a9-ef3cfb13278f%22%2c%22Oid%22%3a%2237b294ca-c730-4a72-823e-da60d8a45534%22%7d Meeting ID: 229 349 350 45 Passcode: Vxvn6C
UPDATES