Access the Full Project by Clicking here!
Bidjugde
JOB
City Dripping Springs East Interceptor Segment 1
BID DATE
08/9/24 - 10:00
AGENCY
Dripping Springs
ESTIMATE
n/a
SCOPE
The work to be performed includes furnishing all materials, equipment, tools, and labor necessary for the construction of the proposed 24- and 30-inch gravity main that is approximately 2947 feet. The gravity main will cross Highway 290 going south which will require boring and the approximate length of bore is 417. The proposed project will occur in conjunction with a current on-going Village Grove project that was awarded to a contractor. https://www.civcastusa.com/project/669fa6f026d3ebfcacfff820/summary Priya.Bhowmik@burgessniple.com
PREBID
8/1/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT