Access the Full Project by Clicking here!
Bidjugde
JOB
Camp Swift Estates Approach Main Pump Station
BID DATE
08/27/24 - 2:00
AGENCY
Aqua Water Supply Corporation
ESTIMATE
n/a
SCOPE
Installation of approximately 5,200 LF of 6" & 12" SDR-21 PVC water line, Installation of a pump station including rock face CMU building, Installation of one (1) 10,000-gallon hydropneumatic tank, Installation of one (1) 350,000-gallong ground storage tank, Installation of one (1) fill valve and vault, Installation of required yard piping, Installation of appurtenances, including but not limited to electrical, controls, and lightning protection, Replacement of any damaged or disturbed property, including but not limited to property fences and graded drainage ways. https://www.civcastusa.com/project/66a7d372fdd47bc4fed6f184/summary sdavis@stegerbizzell.com
UPDATES