Pecan Valley Drive 8 Inches Water Line Replacement
BID DATE
08/16/24 - 10:00
AGENCY
Varner Creek Utility District
ESTIMATE
n/a
SCOPE
The WORK generally consists of installing 1,070 linear feet of 8" waterline, two wet connections, 245 linear feet of 8" water line bores under driveways and sidewalks, two 8" x 8" wet connections to existing 8" AC water line, reconnect two (2) fire hydrants to the proposed 8" water line after proposed 8" water line is in service, reconnect 13 water line services to the proposed 8" water line after proposed 8" water line is place into service, plug and abandon existing 6" water line after the proposed 8" water line is placed into service and other items of work as detailed in the plans. https://www.civcastusa.com/project/66a7a5fb752a47028b873467/summary rcrouch@bakerlawson.com
PREBID
8/8/2024 10:00