Access the Full Project by Clicking here!
Bidjugde
JOB
S Platte River Drive Improvements W Virginia W Bayaud Ave
BID DATE
08/22/24 - 11:00
AGENCY
Denver
ESTIMATE
$10,000,000
SCOPE
The project will realign South Platte River Drive from Virginia to a point South of Alameda to allow for the trail upgrades and increase the buffer between the trail and the roadway. The realignment will tie into the Alameda and Platte River Drive intersection improvements by CDOT that are a part of the Alameda 2.0 project. The project will realign South Platte River Drive from Virginia to a point South of Alameda to allow for the trail upgrades and increase the buffer between the trail and the roadway. The realignment will tie into the Alameda and Platte River Drive intersection improvements by CDOT that are a part of the Alameda 2.0 project. Sections of the trail between Virginia Avenue and Bayaud Avenue have a narrow width of 8 feet. These areas within the project limits will be realigned and reconstructed to provide a 12 foot concrete trail and a 4 foot crusher fines sidepath with 3 foot recovery zones on each side to meet the current standards. CDOT will be constructing the trail improvements under the proposed Alameda bridge over the Platt River. The trail section at the underpasses will be reconstructed to include a 12 foot concrete path with 3 foot colored concrete rumble strips on each side. The trail improvements as a part of this project will connect to those completed by CDOT. Lastly, this project will construct connections from the trail to the local street network and Valverde Park to improve access to the facility. https://denvergov.org/Business/Contract-Administration/Bids/202474276 doti.procurement@denvergov.org DOTI.Procurement@denvergov.org
PREBID
7/30/2024 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT