2025 Orem Water Reuse Pipeline
BID DATE
08/14/24 - 3:00
AGENCY
Orem
ESTIMATE
$800,000
SCOPE
The WORK will consist of construction of a reuse pipeline, but not limited to, 2,497 linear feet of PVC C-900 DR18 reuse water pipeline, 3 combination air valve manholes, 2- 8” reuse water loops, 2 – half 8” reuse water loops, 4- 8” gate valves, asphalt pavement restoration, concrete curb & gutter & sidewalk, site restoration, and other improvements. The engineer’s estimate is for the work $700,000 to $800,000 SITE OF WORK: The site of the WORK is located generally at 400 South to 575 South, Sleepy Ridge Drive in Orem, UT and Vineyard, UT and Springwater Park on 1000 South, Orem, UT. https://orem.org/2025-orem-water-reuse-pipeline-project/