Main Renewal Dairy Avenue H Street
BID DATE
07/31/24 - 2:30
AGENCY
Alameda County WD
ESTIMATE
n/a
SCOPE
The work in the City of Union City consists of furnishing and installing approximately 1,000 linear feet of 8-inch diameter PVC pipe including appurtenances, approximately 2,720 linear feet of 8-inch diameter steel pipe including appurtenances; installation of service laterals and meter boxes; fire hydrant assemblies; blow off assembly; air valves and gate valves; cathodic protection system; disinfection, testing and final system connection (closures) to existing main and pavement restoration. The work in the City of Newark consists of furnishing and installing approximately 400 linear feet of 8-inch diameter PVC pipe including appurtenances, approximately 500 linear feet of 8-inch diameter steel pipe including appurtenances; installation of service laterals and meter boxes; fire hydrant assemblies; blow off assembly; air valves and gate valves; cathodic protection system; disinfection, testing and final system connection (closures) to existing main and pavement restoration. Tina Nguyen 510-668-4499 engoffice@acwd.com https://www.bidnetdirect.com/california/solicitations/open-bids/Main-Renewal-Dairy-Avenue-and-H-Street/0000356092?purchasingGroupId=88020151&origin=2
PREBID
7/9/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT