Access the Full Project by Clicking here!
Bidjugde
JOB
Runway 17 35 Reconstruction Phase V
BID DATE
08/14/24 - 2:30
AGENCY
Victorville
ESTIMATE
n/a
SCOPE
RFP Number: CC24-126 This project entails the fifth phase of the reconstruction of the asphalt portions of Runway 17/35, consisting of the removal and replacement of approximately 120,000 square feet of structural runway pavement section to current FAA Design Standards. Ancillary to the runway reconstruction work, partial replacement of approximately 1,600 linear feet of existing asphalt runway shoulders shall be performed. Phase V includes improvements to the existing storm drainage system at the intersection of Runways 17/35 and 3/21, where approximately 1,800 linear feet of storm drain piping will be installed. Reconstruction of the Runway 3 blast pad pavement (88,000 square feet) shall be performed with the storm drain improvements along with improving an existing storm water basin. Lastly, Phase V will entail the reconstruction of approximately 35,000 square feet of taxilane PCC pavement. https://www.victorvilleca.gov/Home/Components/RFP/RFP/3672/600 cmcalderon@victorvilleca.gov
PREBID
7/24/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT