Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2024 25 Annual Major Streets Rehabilitation Cochran Street West End to First Street
BID DATE
07/25/24 - 3:00
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
SPECIFICATION NO. SV 24-26 As described in the Bidding Documents, the bids are for a public works project, FY 2024-25 Annual Major Streets Rehabilitation Program: Cochran Street (West End to First Street) (“Project”), which consists of: 1) 286,060 S.F. of 2 ½” asphalt pavement cold milling; 2) sawcut, removal, and reconstruction of 159 S.F. of sidewalk; 3) sawcut, removal and reconstruction of 1,027 S.F. of cross gutter and spandrel; 4) 109 L.F. of concrete sidewalk grinding; 5) 5 sawcut, remove and reconstruction of curb ramps; 6) sawcut, removal and installation of 1 cast-in-place truncated dome; 7) application of 19,536 S.Y. of crack seal; 8) application of 19,536 S.Y. of type III microsurfacing; 9) placement of 4,600 tons of rubberized asphalt concrete; 10) various traffic signing and pavement delineation; 11) 19 sewer manhole frames, rings and covers replacement; 12) 64 water valve assembly replacement; 13) 6 storm drain manhole lower and adjust to Specification No. SV 24-26 6 BPCONSTR SV-24-26 grade; 14) 4 traffic signal video detection installation; and 15) all appurtenant work. The expected completion time of the Project is 40 consecutive working days after receipt of the Notice to Proceed. https://www.simivalley.org/Home/Components/RFP/RFP/215/169 Akhandaker@simivalley.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT