2023 2024 Watermain Replacement Cambridge Emerald Hills
BID DATE
07/31/24 - 2:30
AGENCY
Redwood City
ESTIMATE
$3,800,000
SCOPE
The work includes furnishing labor, equipment, and materials for installing PVC and HDPE water pipe, including valves, couplings, air release valves, blow off assemblies, tapping sleeves, corrosion protection, restraints, trenching, traffic controls, dust controls, paving, pavement restoration with slurry seal where required on the Project Drawings on San Mateo County right-of-way, new domestic water services, new water services to existing water main, abandonment of existing water services, fire hydrant assemblies, fire hydrant assemblies to existing water main, shoring and all other associated work. Contract Documents fully describe the Work. https://www.redwoodcity.org/Home/Components/RFP/RFP/1888/2322 alai@redwoodcity.org