Access the Full Project by Clicking here!
Bidjugde
JOB
Eastside Trunk Sewer Phase III and Synder Lane Widening
BID DATE
04/20/15 - 2:00
AGENCY
Rohnert Park
ESTIMATE
$9,500,000
SCOPE
Road widening to the east along Snyder Lane, including new full-width roadway pavement section, pedestrian corridor improvements; signing and striping, median, curb, gutter, sidewalk, and landscaping; 2. Demolition and clearing and grubbing; 3. Pavement grind and overlay; 4. Traffic signal modifications, improvements and lighted pedestrian crossings; 5. Widening of the existing bridge structure (box culverts) at Copeland Creek and construction of roadside barriers; 6. Replacement of existing storm drainage and construction of LID improvements and structures 7. Construction of water services and irrigation systems; 8. Construction of Eastside Trunk Sewer Phase 3 between its connection with Phase 2 at Southwest Boulevard and Rohnert Park Expressway; 9. Miscellaneous tree removal, clearing and site grading; 10. Entrance, parking lot overlay and striping, and ADA improvements at the adjacent Rohnert Park Community Center; 11. Entrance and parking lot conform improvements at Rancho Cotate High School; and 12. Closure of Snyder Lane for construction from June 7, 2015 to August 18, 2015, and work required to support the Regional Traffic Management Plan.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT