Access the Full Project by Clicking here!
Bidjugde
JOB
2024 FVC Lighted Entrance Target
BID DATE
07/31/24 - 3:00
AGENCY
Yavapai Prescott Indian Tribe
ESTIMATE
n/a
SCOPE
Remove existing asphalt from the lighted entrance into FVC (Target) after ADOT Hwy 69 right of way between Applebee's and Golden Corral to the top of slope where pavers begin. Include separate cost for potential concrete curb replacement at edge of pavers, top of slope. Remove any bad substrate where needed and install and compact 6" ABC. Repave with 4" MAG asphalt over aggregate base, while maintaining existing drainage. Stripe as shown on the exhibit. Include traffic control plan and separate line item for work to be performed in the evening, or after hours. purchasing@ypit.com htippit@ypit.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT