Access the Full Project by Clicking here!
Bidjugde
JOB
Street Improvement Plans Murrieta Plaza (REBID)
BID DATE
02/5/25 - 3:00
AGENCY
Murrieta
ESTIMATE
$850,000
SCOPE
All American Asphalt - $2,898,771 The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated project. The general items of work to be done hereunder consist of: Removals and relocations, excavation and fill operations, erosion control measures, traffic control measures, adjustments to grade, construction of curb, gutter, sidewalk, concrete cross gutter, parkway culvert, aggregate base, asphalt paving, asphalt grinding and overlay, water relocations, removal and reconstruction of pressure reducing station, entry monument relocation, street light relocations, Filterra Unit BMP and storm drain connections thereto, traffic signal modification, traffic signing and striping, and other ancillary works on Murrieta Hot Springs Road and Alta Murrieta Drive, all as shown on the Plans, Standard Plans, and as specified in the Bid Specifications. https://vendors.planetbids.com/portal/17992/bo/bo-detail/125201 jozouf@murrietaca.gov
UPDATES