P2 Sewer Upsizing
BID DATE
08/8/24 - 2:00
AGENCY
National City
ESTIMATE
$4,100,000
SCOPE
P-2 Sewer Upsizing CIP No. 24-03. The general scope of work is to remove and replace the existing 6" sewer main with 8" and 10" SDR35 pipe along 4th St and Harbison Ave. The scope of work includes but is not limited to removal and replacement of existing manholes, 6" sewer main and existing lateral connections from the main to the end of the right-of-way. PCC improvements include but are not limited to pedestrian curb ramps, cross gutters, curbs and gutters and sidewalks. Asphalt improvements include 2" grind and overlay and 4" digouts. This is a general description of the work to be done by the Contractor and is not intended to be the official scope of work which is described in the Contract Documents. https://vendors.planetbids.com/portal/24103/bo/bo-detail/119242 lZappiello@nationalcityca.gov