Access the Full Project by Clicking here!
Bidjugde
JOB
ARPA Local Drainage Mitigation Package 2
BID DATE
07/30/24 - 2:00
AGENCY
Phoenix
ESTIMATE
n/a
SCOPE
The work will include the installation of 15”, 18”, 24”, 30”, 36”, and 42” storm drain pipes, catch basins, manholes, and/or inlet structures. The project will also include installation, removal and replacement of asphalt-concrete pavement, microseal, valley gutters, sidewalk, curb and gutter. Removal of existing pumps and disconnected of related electrical lines. annette.perez@phoenix.gov https://solicitations.phoenix.gov/Solicitations/Details/1849
PREBID
7/9/2024 11:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT