Access the Full Project by Clicking here!
Bidjugde
JOB
Old Highway 66 Rubberized Chip Seal FY 24 25
BID DATE
07/18/24 - 1:30
AGENCY
Yavapai County
ESTIMATE
$5,464,216
SCOPE
The scope of work includes furnishing of all labor, materials, equipment, fixtures, and services required for the placement of a rubberized chip seal and a fog seal coat on Old Highway 66 between Pica Camp Road and I-40 Crookton Road interchange in Yavapai County. The project length is 176,327 feet (33.4 Miles) with an approximately 639,434 square yards of roadway surface receiving the rubberized chip seal. In addition, 3 feet wide CRS-2P chip seal strips shall be placed over prepared milling shoulders prior to the installation of rubberized chip seal coat between Seligman and I-40 Crookton Road interchange, with a total 60,705 square yards of CRS-2P chip seal estimated. PublicWorksBids@yavapaiaz.gov https://www.yavapaiaz.gov/County-Government/Bids/Public-Works/PWK-Road-Construction-Bids/Old-Highway-66-Rubberized-Chip-Seal-FY-24-25-2423699
PREBID
7/9/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT