Access the Full Project by Clicking here!
Bidjugde
JOB
New Waverly Mud No 1 Wp No 1 Ph 1
BID DATE
11/7/24 - 2:00
AGENCY
Walker County
ESTIMATE
n/a
SCOPE
The work which shall consist of drilling and developing the New Waverly MUD 1 Well No. 1 and Well No. 2: Well No. 1 • Well No. 1 shall consist of 442 feet of 10-inch steel casing cemented to 385 feet and 100 feet of 10-inch pipe-based stainless steel screen on 10-inch perforated steel pipe set within a 20-inch gravel packed bore. The well shall be equipped with a 500 gpm, 40 H.P. submersible pump set with 357 feet of 6-inch steel column pipe. Well No. 2 • Well No. 2 shall consist of 442 feet of 10-inch steel casing cemented to 385 feet and 100 feet of 10-inch pipe-based stainless steel screen on 10-inch perforated steel pipe set within a 20-inch gravel packed bore. The well shall be equipped with a 500 gpm, 40 H.P. submersible pump set with 357 feet of 6-inch steel column pipe. The project includes all site work necessary for well construction, including but not necessarily limited to clearing and grubbing and brush disposal; grading; and drainage ditching. https://www.civcastusa.com/project/65e75821d597763b125d9fd3/summary constructionadmin@elevationlandsolutions.com
UPDATES