Access the Full Project by Clicking here!
Bidjugde
JOB
Greater El Paso Landfill Cells 15 20
BID DATE
07/24/24 - 2:00
AGENCY
El Paso
ESTIMATE
n/a
SCOPE
"General: The Work included in the contract includes, but is not limited to, the following: 1. Earthwork to prepare the liner subgrade; cell floor and sideslope liner systems, comprised of a 6-inch stabilized side slope, reinforced geosynthetic clay liner, and 60-mil geomembrane (smooth on floor and double-sided textured on sideslopes); 2. Leachate collection system, comprised of leachate collection sump and piping, drainage aggregate, double-sided geocomposite, and non-woven geotextile; 3. Liner protective cover soil; 4. Concrete sump/cleanout riser retaining wall; 5. Leachate pump, controls, and electrical; Revision 0 01010-3 SECTION 01010 SUMMARY OF WORK 6. Leachate forcemain; 7. Stormwater drainage features around the cell construction area, comprised of berms, perimeter ditches, corrugated metal pipe (CMP) culverts, rip rap, and other associated items; 8. Haul/access road, ramp, and tipping pad; 9. Electrical connection and 10. Other appurtenances specified in the Construction Plans and Technical Specifications; 11. Add alternates related to the following: a. AA-1: Allowance – An allowance in the amount of $300,000 for use only as directed by the Owner for out of scope work or change orders that may arise during construction. b. AA-2: Construction of a new breakroom. https://elpasotexas.ionwave.net/PublicDetail.aspx?bidID=930&ret=OPEN&sort=CloseDate%7eD maldonadoea@elpasotexas.gov "
UPDATES