East Sunnymead Blvd Storm Drain
BID DATE
04/10/15 - 2:00
AGENCY
Moreno Valley
ESTIMATE
$762,449
SCOPE
This project involves the installation of two (2) storm drain pipes at a total length of approximately 2,055 feet with ancillary storm drain structures, the removal and replacement of miscellaneous concrete items (curb and gutter, sidewalk, and driveway), the removal and replacement of asphalt, relocation of existing utilities, and the replacement of traffic signal loops and striping along north side of Sunnymead Boulevard between Indian Street and the State Route 60 Eastbound Off-ramp/Perris Boulevard. Stephanie Cuff - 951-413-3134 stephaniec@moval.org