5300 West Lift Station SS17 Capacity Upgrades
BID DATE
08/9/24 - 4:00
AGENCY
Salt Lake
ESTIMATE
$8,923,250
SCOPE
CONSTRUCTION OF A NEW CAST-IN-PLACE WET WELL AND BELOW-GRADE DRY PIT WITH STAIRWAY ACCESS. THREE DRY PIT SUBMERSIBLE PUMPS AND ASSOCIATED PIPING WILL BE INSTALLED INCLUDING MAGNETIC FLOW METERS AND A BYPASS PUMP CONNECTION. A GRINDER WILL BE INSTALLED AT THE WET WELL GRAVITY INVERT AND A PROTECTIVE COATING WILL BE APPLIED ON THE INTERIOR OF THE WET WELL. A PERMANENT STANDBY DIESEL GENERATOR WILL BE INSTALLED AT GRADE AND THE ELECTRICAL GEAR WILL BE LOCATED IN THE DRY PIT. A NEW MANHOLE AND GRAVITY LINE WILL DIRECT FLOW INTO THE NEW LIFT STATION AND PARALLEL 12” AND 16” HDPE FORCE MAINS WILL BE INSTALLED IN A NEW DISCHARGE VAULT. THE EXISTING LIFT STATION WILL BE DEMOLISHED. Amanda Nave +1 801-483-6781 amanda.nave@slcgov.com Danna Christensen +1 801-483-6771 danna.christensen@slcgov.com