Access the Full Project by Clicking here!
Bidjugde
JOB
County 25th Street: Avenue E to Avenue D
BID DATE
04/10/15 - 2:00
AGENCY
Yuma County
ESTIMATE
n/a
SCOPE
GENERAL DESCRIPTION: A brief description of the work to be performed includes: ï‚· Two Phased project: ï‚· Phase 1 County 25th Street Roadway Construction between Ave. E and Ave D ï‚· and BOR 242 Lateral: Construct Reinforced Box Culvert ï‚· Phase 2- Construct road improvements within the Magrino Industrial Park Subdivision ï‚· Construction of a 26 foot wide paved roadway with 8-foot shoulders on County 25th Street between Avenue E to Avenue D. ï‚· Subgrade preparation, Aggregate Base Course, Asphalt paving and striping. ï‚· Provide curb returns at the intersections. ï‚· Furnish and install Traffic control materials ï‚· Construction, within an Industrial Subdivision, internal industrial roads 54 feet wide approximately 4,100lf with approximately 7,200lf of curbing and one [1] RCBC -80lf each and one [1] 48" dia. RGRCP 80lf. ï‚· Raise/ adjust various water valves/covers/meter boxes ï‚· Raise/adjust manhole frames and cover and adjust force main clean out.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT