Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2024 25 Annual Major Streets Rehabilitation Los Angeles Ave Ralston St Yosemite Ave
BID DATE
07/2/24 - 3:30
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
FY 2024-25 ANNUAL MAJOR STREETS REHABILITATION PROGRAM: LOS ANGELES AVENUE (RALSTON STREET TO YOSEMITE AVENUE), CP60000018. which consists of 1) 320 LF of root pruning and root barrier installation; 2) 505,378 S.F. of 2 ½” asphalt pavement cold milling; 3) 2,570 S.F. of 6” asphalt pavement cold milling; 4) sawcut, removal, and reconstruction of 6,205 S.F. of sidewalk; 5) sawcut, removal, and reconstruction of 103 L.F. of curb and gutter; 6) sawcut, removal, and reconstruction of 980 S.F. of 8” residential driveway approach; 7) sawcut, removal, and reconstruction of 826 S.F. of cross gutter and spandrel; 8) sawcut, removal, and reconstruction of 1 parkway drain; 9) sawcut, removal, and reconstruction of 1,281 S.F. of bus turnout; 10) sawcut, removal, and installation of 7 cast-in-place truncated domes; 11) sawcut, removal, and reconstruction of 11 curb ramps; 12) 242 L.F. of Specification No. SV 24-02 6 BPCONSTR May 2024 SV-2402 concrete sidewalk grinding; 13) sawcut, removal and reconstruction of median curb and paved median; 14) placement of 8,300 tons of rubberized asphalt concrete surface course; 15) placement of 30 tons of asphalt concrete surface course; 16) placement of 50 tons of asphalt concrete base course; 17) traffic signing and pavement delineation; 18) adjustment and replacement of 25 sewer manhole frames, rings and covers; 19) adjustment and replacement of 38 water valve covers and concrete rings; 20) adjustment of 6 storm drain manholes to grade; 21) adjustment of 2 survey monuments to grade, and 22) all appurtenant work. https://www.simivalley.org/Home/Components/RFP/RFP/210/169 bzastrow@simivalley.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT