Murphy Sidewalk T 1
BID DATE
07/11/24 - 2:00
AGENCY
Murphy
ESTIMATE
$520,000
SCOPE
The project includes 700' of concrete and asphalt trail between S. Maxwell Creek Road and McCreary Road along with a pedestrian crossing of McCreary Road and a 2 - 8' x 8' box culvert low water crossing of Maxwell Creek with wingwalls and apron. ='https://www.civcastusa.com/project/6669c3e91828e6b5cacb8da8/summary' target='_blank'>https://www.civcastusa.com/project/6669c3e91828e6b5cacb8da8/summary wade.barnes@neel-schaffer.com