Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation Drainage Improvements Fy24
BID DATE
07/18/24 - 11:00
AGENCY
West Lake Hills
ESTIMATE
n/a
SCOPE
Project includes pavement rehabilitation including approximately 18,300 SY of mil and overlay, 22,700 SY of surface preservation, 600 SY of full depth repair, and crack sealing. Project also includes grading of the channel at Rollingwood Dr. & Las Lomas Dr. intersection to improve stormwater conveyance into the existing culvert, and the addition of a roadside swale, driveway culverts, and valley gutters along the east side of North Peak Dr. Project also includes the removal of pavers on Bent Tree cul-de-sac and an alternative bid of replacing the pavers with stained concrete or asphalt. https://www.civcastusa.com/project/66704a877f0d3ca7b6440240/summary jbills@westlakehills.gov
PREBID
6/27/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT