JOB
Fain Lake Bridge Replacement
BID DATE
09/19/24 - 3:30
AGENCY
Prescott Valley
ESTIMATE
n/a
SCOPE
The new bridge shall be built of similar materials and design as the original bridge at Fain Lake. The bridge shall float on pontoons, rising and falling as the lake level fluctuates (up to 10’ rise and fall). The bridge will need to possess handrail on both sides. The span the bridge needs to cover is 165’, and the entrance and exit of the bridge are both higher elevation than the bridge itself, therefore, ramps on both ends of the bridge will need to be included. Bridge will need to be separated into several segments, connected with rods and hinges. This bid will also need to include the anchor system to keep the floating bridge in place. Bill Osborne (928) 759-3083 bosborne@pvaz.net ngroblewski@prescottvalley-az.gov