College Lot P2 Replacement Lot P5 North Repairs
BID DATE
06/27/24 - 3:00
AGENCY
Davis Technical College
ESTIMATE
$153,000
SCOPE
Remove Existing Asphalt Pavement. Remove Existing Base Course Gravel and Subbase material to 9” below finish grade; (22,607 s.f.x6”). Proof-roll, fine grade and recompact subbase soils. Excavate and remove existing subbase soils to 21-inches below finish grade (5,650 s.f. x 12”); (Over-excavation of soft areas if needed; 25% of total site area). 6” thick untreated base course gravel – Grade 1.5 max. 12” thick A1a Imported Granular Borrow; (Replacement fill for over-excavated soft areas if needed). 3” Thick Bituminous Concrete Mix – DM ½. Sawcut Top Of Curb To Level With Adjacent Concrete Slab. Electric Vehicle Symbols. 4” Wide Yellow Paint Striping 1 Application. Construction Signing & Barricades