Access the Full Project by Clicking here!
Bidjugde
JOB
Sequoia Court Storm Drain Repair
BID DATE
07/10/24 - 2:00
AGENCY
Morro Bay
ESTIMATE
$329,015
SCOPE
General work description: The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the removal of a 36” CMP Storm Drainpipe, replacement with a 36” HDPE storm drainpipe, connection to existing headwall, laterals, and storm drain manhole, curb & gutter, sidewalk, curb opening catch basin, pavement restoration, and specified hardscape restoration. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, Caltrans Standard Specifications, and Greenbook with whichever is more restrictive applying if a conflict arises. https://www.morrobayca.gov/bids.aspx?bidID=124 adella@morrobayca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT