Access the Full Project by Clicking here!
Bidjugde
JOB
Driftwood Creek Fm 150 12 Inches Treated Effluent 10 Inches Raw Wastewater Forcemains Phase I Ii
BID DATE
06/19/24 - 2:00
AGENCY
Driftwood Conservation District
ESTIMATE
n/a
SCOPE
The work generally consists of furnishing all plant, labor,material, and equipment, and performing all work required for the construction of a 12” Treated Effluent Forcemain which consists of approximately 25,640 LF of HDPE pipe including approximately 540 LF of Jack and Bore and approximately 942 LF of Horizontal Directional Drill (HDD) installation methods. The work also includes construction of a 10” Raw Wastewater Forcemain which consists of approximately 20,140 LF of HDPE pipe including approximately 440 LF of Jack and Bore and approximately 577 LF of Horizontal Directional Drill (HDD) installation methods. This project is located generally paralleling the ROW of FM 150, Hays County, Texas 78619. https://www.civcastusa.com/project/664cbb2a083dce528f521a4c/summary mkotalik@murfee.com
PREBID
6/12/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT