Access the Full Project by Clicking here!
Bidjugde
JOB
Secondary Waterline Street Resurfacing Elk Hollow
BID DATE
06/11/24 - 3:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
Project consists of the installation of new secondary water line in Elk Hollow Road & Elk Hollow Circle. Installation of twenty-six (26) new water meters, and the transfer of outdoor water services from culinary water to the new secondary water meters. Approximately 1,710 LF of new waterline. Removal of all existing asphalt after completion of the water line work, with repair of soft spots and additional roadbse as required, finish grading of road, and 3" of new asphalt. Approximately 7,450 SY of asphalt. Brian Campbell ESI Engineering brian.campbell@esieng.com City of North Salt Lake engineering@nslcity.org https://www.nslcity.org/bids.aspx?bidId=122

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT