Access the Full Project by Clicking here!
Bidjugde
JOB
Sunrise Boulevard Rehabilitation Phase 2
BID DATE
05/30/24 - 2:00
AGENCY
Rancho Cordova
ESTIMATE
$12,624,000
SCOPE
The work to be done under this contract consists, in general, of furnishing all labor, materials, tools, equipment, incidentals, and for doing all work necessary for repairing sidewalk and ADA sidewalk curb ramps, removing and replacing concrete median curbs, landscape and irrigation, grinding AC areas and performing Partial Depth Recycle (PDR) and capping with rubberized asphalt concrete, all along Sunrise Blvd, as well as upsizing storm drain pipe along Mechanical Dr & Recycle Rd, and other items and details not mentioned above but described in these Special Provisions or shown on the Plans or Contract Documents or as designated by the engineer. https://www.cityofranchocordova.org/Home/Components/RFP/RFP/1366/2573
PREBID
5/14/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT