Access the Full Project by Clicking here!
Bidjugde
JOB
DEMA Road Maintenance Repair
BID DATE
05/28/24 - 3:00
AGENCY
AZDEMA
ESTIMATE
n/a
SCOPE
Price to include; Milling and removal of existing Asphalt Concrete (AC). Installation of re-processed ABC as may be required and provided by Owner and placed to line and grade and compacted. Place 20’ wide x 4” thick AC in 2 lifts of 2” each at a fixed roadway width of 20 feet. Fog Seal as specified under Materials, and apply Solid Double Yellow centerline striping with Traffic paint as specified under Materials; and in accordance with this Scope of Work and Specifications cited. The work is described as, but not limited to; surveying the existing paved road for line and grade prior to any demolition, utilizing this data to re-establish line and grade. Milling and removal of existing Asphalt Concrete (AC). Milling and removal of existing Aggregate Base Coarse (ABC) material as needed, placing the milled AC and ABC in separate stockpiles in a centrally located area identified by the Owner. The haul route should not exceed 5 miles round trip. Re-install the Owner Provided ABC as needed to line, and grade as determined by pre survey and as staked by survey crew. Place 20’ wide x 4” thick AC in 2 lifts of 2” each. Fog Seal AC as specified within 48 hours of placing AC, Strip 4” double yellow centerlines 48 hours or more after Fog Seal.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT