Access the Full Project by Clicking here!
Bidjugde
JOB
West Avenue D Extension Loop 121 Kennedy Court
BID DATE
06/13/24 - 10:00
AGENCY
Belton Economic Development Corporation
ESTIMATE
n/a
SCOPE
This project includes, but is not limited to, replacement of approximately 8,050 square yards of 4” Type B HMAC and 2” Type D HMAC, 10,000 square yards of moisture conditioned subgrade, 6” crushed limestone base material and geogrid, 3,550 linear feet of curb and gutter, concrete radius units, valley gutters, sidewalks, driveway approaches, striping, 4 precast light foundations, 500 linear feet of 2” PVC Schedule 40 conduit with pull string, curb inlets, area inlets, 18”-72” reinforced concrete pipe, headwalls, 694 linear feet of 8" PVC waterline, 647 linear feet of 12” PVC waterline installation of 8” and 12” Fittings (90°, 45°, 22.5°, 11.5°), 8” and 12” gate valves, 110 linear feet of 16” steel encasement by open cut, 420 linear feet of 8” PVC SDR 26 wastewater pipe with manholes, 770 linear feet of 8” PVC C900 force main, SWPPP installations and traffic control, etc. https://www.civcastusa.com/project/664b544d27e69249de0a61c1/summary jsimcik@kpaengineers.com
PREBID
5/28/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT