Access the Full Project by Clicking here!
Bidjugde
JOB
S Elm St Reconstruction
BID DATE
06/18/24 - 2:00
AGENCY
Keller
ESTIMATE
$22,500,000
SCOPE
Competitive Sealed Proposal for the reconstruction of the existing S. Elm Street within Keller's Old Town. The major project components are: Reconstruction the existing s. Elm street roadway with decorative concrete and street approaches of adjacent side streets; Reconstruction of a portion of pecan st and e. Vine st with concrete pavement; Trail reconstruction with 2.5’ max height retaining wall; Bridge with decorative shade structure over bear creek near bear creek pkwy; Water/wastewater improvements; Underground roadway drainage system improvements including: reinforced concrete pipe and box, curb inlets, area drains, and drop inlets, and system outfall at bear creek with a headwall; Street lighting and electrical improvements; Gateway feature fabrication and installation; Wayfinding fabrication and installation; Street furniture; and Landscaping and irrigation along the road https://www.civcastusa.com/project/6633dcebf42331c8dbf60fab/summary sam.fries@kimley-horn.com
PREBID
5/29/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT