Access the Full Project by Clicking here!
Bidjugde
JOB
South Mapleton Waterline Well Tank
BID DATE
06/6/24 - 3:00
AGENCY
Mapleton
ESTIMATE
n/a
SCOPE
1. Installation of ±2,400 linear feet of 12” DI waterline from the Crowd Canyon culinary well to the Crowd Canyon storage tank, and ±32 linear feet of 18” DI waterline near the tank. 2. Associated air valve vaults, fittings, thrust restraints, and connections to existing water mains to separate the proposed well to tank waterline from the existing culinary distribution main. 3. Excavation, backfill, and restoration of the existing road base access road.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT