Access the Full Project by Clicking here!
Bidjugde
JOB
Highway 47 Transmission Main Phase B
BID DATE
05/31/24 - 2:00
AGENCY
Bryan
ESTIMATE
$4,000,000
SCOPE
Furnish and install all labor, materials, equipment, appliances, and services necessary of the completion of the work consisting of installation of 13,820 linear feet of 18-inch water line, of which 190 LF is installed in 30-inch steel casing pipe by either Pipe Boring, Jacking, or Tunneling across W. State Highway 21 and 110 LF is installed in 30-inch steel casing pipe on piers across Thompson Creek, 130 LF of 12-inch water line, 15 LF of 6-inch water line, installation of air valves, gate valves, blowoff valves, fire hydrants, service lines, water system connections, pipe supports, relocation of meters, roadway repairs, driveway repairs, traffic control, construction of pipe bridge on drilled piers, aerial crossings over storm drains and drainage ways, slope stabilization rip rap, and other miscellaneous work items for complete project. cbenavides@bryantx.gov https://brazosbid.ionwave.net/PublicDetail.aspx?bidID=2584&ret=OPEN
PREBID
5/22/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT