Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) New Sewer Lines Rittenhouse Road Pecos Road
BID DATE
07/4/24 - 11:00
AGENCY
Mesa
ESTIMATE
$27,000,000
SCOPE
CP1185NS03 New Sewer Lines - Rittenhouse Sewer Installation of a new 36-inch diameter sewer line along Pecos Road from Power Road to the East Mesa Interceptor (EMI) located along the East Maricopa Floodway. Rehabilitation or replacement of an existing metering station (MS-9) that measures East Mesa Interceptor (EMI) flows. Installation of metering facilities for the new relief sewer. CP1185NS08 New Sewer Lines - Pecos Rd Relief Sewer Installation of a relief sewer parallel to the existing sewer in Pecos Road from Ellsworth Road to Power Road. The new relief sewer is planned to be routed on the north side of the existing sewer on Pecos Road, with periodic tie-overs from the existing sewer to the new sewer to shed flow load on the existing sewer. The proposed sewer will intercept any sewer services or sewer mains flowing from the north. The relief sewer is planned to be 18-inch diameter from Ellsworth Road to Hawes Road, 21-inch from Hawes Road to Sossaman Road, and 27-inch from Sossaman Road to Power Road, as determined by the 2018 Wastewater Master Plan Update. The relief sewer is to connect to an existing dry sewer at the north of the Pecos/Power Road intersection. Tracy.Gumeringer@mesaaz.gov
UPDATES