Access the Full Project by Clicking here!
Bidjugde
JOB
Gila Box GAOA Campground Improvements
BID DATE
06/17/24 - 2:00
AGENCY
Department Interior
ESTIMATE
n/a
SCOPE
Owl Creek work to be performed includes but not limited to: 1. Demolish and remove existing camp site amenities including ramada, concrete picnic table, site number post, fire ring and grill at each of seven camp sites. 2. Re-grade parking lot, access road and campsites. Install new ramada, picnic table, site number post, fire ring and grill at each of seven camp sites. 3. Remove and replace the door and roof of existing single-vault toilet building at the parking lot. 4. Remove and replace existing informational kiosk at the parking lot. 5. Install four new, 12” HDPE storm water culverts with rip rap at inlets and outlets, and grade outlet channels to daylight at an existing wash. Riverview work to be performed includes but not limited to: 1. Demolish and remove existing camp site amenities including ramada, concrete picnic table, site number post, fire ring and grill at each of thirteen camp sites. 2. Repair and re-grade access road in two locations. Install two, 24” Corrugated Metal pipe culverts at wash crossing in main access road. 3. Install new ramada, picnic table, site number post, fire ring and grill at each of thirteen camp sites. Re-grade and stabilize campsites. 4. Remove and replace existing informational kiosk at the parking lot. lmckeon@blm.gov https://sam.gov/opp/f12d05ca501a4e939ba22d25d2455427/view
UPDATES