Access the Full Project by Clicking here!
Bidjugde
JOB
Package 4 South Lake 42 inch Finished Water Line
BID DATE
06/13/24 - 2:00
AGENCY
Georgetown
ESTIMATE
n/a
SCOPE
The project consists of furnishing, installing and providing all labor and materials required for construction of approximately 17,000 LF of 42-inch ductile iron finished waterline via open trench methods, approximately 50 LF of 42-inch finished waterline in 54-inch steel casing via trenchless methods, 60-inch by 42-inch pipe connection, pressure reduction valve vaults, air valve manholes, butterfly valves, drain valves, fire-hydrants and appurtenances as more fully described in the drawings and the summary of work contained in Section CIP3. nicole.abrego@georgetown.org https://gtowntx.ionwave.net/PublicDetail.aspx?bidID=2026&ret=OPEN
PREBID
5/16/2024 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT