Access the Full Project by Clicking here!
Bidjugde
JOB
Cole Boulevard ML King Ave Bowker Rd Rehabilitation
BID DATE
05/28/24 - 2:00
AGENCY
Calexico
ESTIMATE
$2,650,000
SCOPE
The Project consist of the grinding of the existing asphalt pavement and overlaying with System 3 Overlay (ARHM-GG on ARAM over Leveling Course), removal and replacement of existing concrete sidewalk, handicap ramp, curb and gutter, and driveways approaches, placement of pavement markings and traffic striping per CAMUTCD (crosswalk, legends, or words), and adjustment of existing utility lids to grade. https://www.calexico.ca.gov/index.asp?SEC=02C8C65F-C700-4B9B-BDB2-2578C0C0CF5C&DE=E101E2ED-3FB2-47A9-A6F0-E09D24F71CE8 falomirl@calexico.ca.gov
PREBID
5/14/2024 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT