Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation FY 2024
BID DATE
05/23/24 - 2:00
AGENCY
Berkeley
ESTIMATE
$12,650,000
SCOPE
The work done under this component includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, valley gutters, concrete traffic diverter and circle, drainage, base failure repairs, ARAM cape seal, cold planing, removal and disposal of pavement surfaces and base materials, stabilization, paving mat, hot-mix asphalt (HMA), speed tables, pavement markings, striping, markers, signage, and traffic loops as specified. https://berkeleyca.gov/doing-business/working-city/bid-proposal-opportunities/street-rehabilitation-fy-2024 WKong@berkeleyca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT