Mobberly Avenue Complete Street High Street Pacific Avenue
BID DATE
05/30/24 - 2:00
AGENCY
Longview
ESTIMATE
$5,490,000
SCOPE
ROW preperation, Concrete Driveway Construction, Sidewalk Construction, Curb & Gutter Construction, HMAC Paving & Preparation, Existing Meter, Valve, and Manhole Adjustment to Grade, ADA Ramps and Crossings, Concrete Retaining Wall Construction, TxDOT Handrails and Ramps, Storm Inlet Top Construction, Concrete Stair Construction, Replace Existing Fences, New Pedestal Poles with Cross Walk Push Buttons, Pavement Markings/Striping, F&I New Road Signs, Landscaping & Irrigation, Site Stabilization, HMAC Paving with Bike Lanes. https://www.civcastusa.com/project/662bdfa8ac524c17ab9bbc4f/summary bradp@johnsonpace.com
PREBID
5/15/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT