Access the Full Project by Clicking here!
Bidjugde
JOB
Utrwd Ih 35 Water Line Relocation
BID DATE
05/14/24 - 1:30
AGENCY
Upper Trinity Regional Water District
ESTIMATE
n/a
SCOPE
The Base Bid for the Project generally consists of: 1. Installation of approximately 13,850 linear feet of 12-inch PVC water main and associated fittings, casing, valves, and appurtenances along the east side of IH-35 from Milam Road to south of Duck Creek (north of Rector Road); and 2. Abandonment of approximately 1,500 linear feet of existing 12-inch water main. 3. Removal of approximately 11,180 linear feet of existing 12-inch water main. 4. Connections to existing water transmission lines 5. All other improvements detailed in the construction plans and specifications The Alternate Bid for the Project generally consists of: 1. Installation of approximately 13,850 linear feet of 18-inch ductile iron or bar wrapped concrete water main and associated fittings, casing, valves, and appurtenances along the east side of IH-35 from Milam Road to south of Duck Creek (north of Rector Road); and 2. Abandonment of approximately 1,500 linear feet of existing 12-inch water main. 3. Removal of approximately 11,180 linear feet of existing 12-inch water main. 4. Connections to existing water transmission lines 5. All other improvements detailed in the construction plans and specifications https://www.civcastusa.com/project/66227687871d7907da1034d3/summary alec.pollok@kimley-horn.com
PREBID
5/7/2024 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT