Access the Full Project by Clicking here!
Bidjugde
JOB
Main Avenue Pedlets
BID DATE
05/14/24 - 5:00
AGENCY
Durango
ESTIMATE
n/a
SCOPE
The City of Durango invites interested, qualified persons or firms, capable of providing the required service to submit bids for two temporary expanded sidewalks on Main Avenue, Installation Assistance, and Traffic Control as part of the City of Durango’s Downtown’s Next Step Design pilot project. The City of Durango is currently designing pedestrian and accessibility improvements along Main Avenue between College Drive and 8th Street as part of the overall Downtown’s Next Step Project, which includes a conceptual design for the entire corridor between 5th Street and 14th Street. The City of Durango will be demonstrating some of the design elements during 2024 as a pilot project. The temporary sidewalk expansions will be up to 100-feet at two locations to be determined along Main Avenue between College Drive and 14th Street. The temporary sidewalk needs to be flush even with the curb to provide as natural of a transition as possible, allowing for an ADA compliant experience. The temporary sidewalk should taper diagonally at both ends to provide a natural transition. The temporary sidewalk should use muted, natural colors that match the existing pedlet on Main Avenue, as to not distract from the historic nature of Main Avenue and bring continuity to downtown. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Main-Avenue-Pedlets/0000350433?purchasingGroupId=8409951&origin=2 alicen.everett@durangoCO.gov bob.grogan@durangoco.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT