Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide Bicycle Pedestrian Improvements Safe Routes School
BID DATE
05/16/24 - 2:30
AGENCY
Dublin
ESTIMATE
$1,650,000
SCOPE
The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: modification to existing pedestrian curb ramps, modifications to curb radiuses, minor civil improvements, installation of foundations, signal poles, posts, pull boxes, wiring, push buttons, and other items of work which are required for installation of Rectangular Rapid Flashing Beacons (RRFBs) at three locations on Grafton Street and Antone Way, Central Parkway and Aspen Street, and Amador Valley Boulevard and Burton Street, and modifications to existing traffic signal at Central Parkway and Hibernia Drive, consisting of installing new traffic signal poles and foundation, traffic signal equipment, pull boxes, traffic signal conduit, conductors and cables, street lighting, installing sidewalk, curb and gutter, ADA curb ramps, and reconstruction drainage inlet Oliver.castillo@dublin.ca.gov https://dublin.ca.gov/Bids.aspx?BidID=324
PREBID
5/7/2024 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT